If this is your first visit, be sure to
check out the FAQ by clicking the
link above. You may have to register
before you can post: click the register link above to proceed. To start viewing messages,
select the forum that you want to visit from the selection below.
parts about right,shop fee ok.
labor takes 8 hours or so.
labor rate is local.
drop the gear case,pop off the power head,2 hours.
remove the midsection and strip it, 2 hours.
reassemble takes another 4-6.
some techs go faster than others.
some techs derig the lower cowl,if I have room I usually set it aside rigged.
if your unsure call the yamaha consumer hot line and ask what labor they pay if it was warrenty.
yamaha warrenty flat rate is fair and generous.
Comment